J Tower 3

constructionLast updated Jul 19, 2026

Tanichu Assetment · Tonle Bassac · condo

Starting price
$330k
Price /m²
from 1,853
Completion
Q4 2028
Launched
Sep 1, 2024
Units
360
Floors
77
Product type
Condo
Ownership
Freehold
Foreign quota
Available

J Tower 3 is a 77-floor, roughly 320-metre condominium tower under construction in Tonle Bassac, on the southern edge of BKK1 in Phnom Penh — on completion it is set to be the tallest residential building in Cambodia. The developer is Tanichu Assetment Co., Ltd., the Japanese-affiliated group behind J Tower 1 and J Tower 2, both delivered in the same district. Completion is targeted for Q4 2028, with handover expected from early 2029. The unit program is unusual for the market: 360 residences, all three-bedroom, in sizes of roughly 166 to 178 m². There are no studios or one-bedroom units — the tower is positioned entirely at the family / end-user premium segment rather than the small-format investor product that dominates Phnom Penh condo supply. Listed pricing starts around USD 330,000, or roughly USD 1,850 per square metre. Units are sold under strata title, the instrument that permits foreign ownership of condominium units in Cambodia, and foreign quota is currently available. Amenities concentrate at the crown: a sky bar and sky pool on the 77th floor, plus indoor pools, fitness, lounges and family facilities distributed through the tower. The developer track record is the central diligence anchor. J Tower 1 and J Tower 2 (55 floors) were both completed and handed over, which distinguishes the J Tower series from the many stalled towers in the Phnom Penh skyline after the 2019–2022 downturn. Construction on J Tower 3 was reported at an early stage (about 5% complete) in a market update in January 2026, so the delivery timeline — not developer intent — is the main risk variable, with sales reported at around 70% of units. What to track: quarterly construction progress against the Q4 2028 target, strata title registration as the building approaches completion, and whether the all-3-bedroom format holds its price premium as newer BKK1/Tonle Bassac supply launches.

Project timeline

FAQ

Who is the developer of J Tower 3?
J Tower 3 is developed by Tanichu Assetment in Tonle Bassac, Phnom Penh.
When will J Tower 3 be completed?
Completion of J Tower 3 is planned for Q4 2028. Current status: construction.
How many units does J Tower 3 have?
J Tower 3 has 360 units across 77 floors.
Can foreigners buy at J Tower 3?
J Tower 3 is registered as a freehold project; foreign quota status: available (last verified 2026-07-19).
What is the starting price at J Tower 3?
Prices at J Tower 3 start from USD 330,000 (as of 2026-07-19).